I review commercial print and signage scopes through AlphaGraphics. The same issues show up repeatedly in RFPs and RFQs: missing quantities, unclear finished sizes, drawings that conflict with the written scope, no install conditions, or a bid due date without the actual completion deadline. A vendor can still guess, but that makes the bids harder to compare.
If you want cleaner pricing from multiple vendors, give everyone the same production facts.
The core bid package
- Project name and project location
- Bid due date and clarification deadline
- Complete scope of work
- Quantities by item and by location
- Finished sizes and flat sizes where relevant
- Material or paper specifications
- Artwork, drawings, elevations, photos, or reference files
- Finishing requirements such as lamination, binding, mounting, contour cutting, drilling, grommets, or hardware
- Delivery, shipping, mailing, pickup, or installation requirements
- Required completion date or event date
- Pricing form, alternates, tax treatment, and submission instructions
For signage and installation bids
The installation conditions can change the price as much as the sign itself. Include the mounting surface, install height, site photos, access restrictions, work hours, removal requirements, electrical information, permit responsibility, engineering requirements, and whether a lift or bucket truck may be needed.
If you have an elevation or sign schedule, include it. If the sign schedule and drawings conflict, call that out before bids are due.
For commercial printing bids
Include finished size, page count, colors, sides, stock, quantity, bleed, binding or finishing, packing, delivery, and whether files will be print-ready. For variable data or mailing, include the estimated record count, personalization fields, mail class, target date, and who is responsible for postage.
For awards, apparel and promotional products
Include quantity, item specifications, decoration method if required, number of imprint locations, number of colors, personalization needs, apparel size breakdowns, in-hands date, shipping locations, and acceptable alternates. If you are open to substitutions, say what matters most: price, brand, material, color, durability, or delivery date.
A useful subject line
RFP / Bid Request - Project Name - Bid Due 9/18/26
That immediately tells the estimator what the email is, which project it belongs to, and when it needs attention.
Do not hide the deadline
There are usually two deadlines: when the bid is due and when the finished work is required. Vendors need both. A price that works for a four-week production window may not be possible for a three-day turnaround.
Ask for alternates when they are useful
If the exact specification is not mandatory, ask for a base bid and one clearly labeled alternate. Examples might include a different substrate, laminate, binding method, sign thickness, or installation approach. That can reveal a meaningful cost or schedule improvement without turning the quote into a pile of unrelated options.